Contractors Unlimited

Kivalliq Announces Aggressive 2010 Exploration Program; Acceleration of Warrants

Kivalliq Energy Corporation (the "Company" or "Kivalliq") has announced its 2010 exploration plans for the Angilak Project in Nunavut, with a focus on the historic Lac Cinquante Uranium Deposit located in Nunavut, Canada.

"We are planning an aggressive drill program for 2010," stated John Robins, President & CEO, Kivalliq Energy Corp. "Our main goal for this year's program will be to establish a 43-101 compliant resource at Lac Cinquante and to conduct additional exploratory drilling to demonstrate the deposit's expansion potential."

Exploration Plan 2010

Timeframe:


Construction of a fully winterized field camp to support expanded operations will be completed during the months of March and April, 2010. Fuel is currently being mobilized to site and the six month drill program will commence in early April. The fourth quarter of 2010 will be dedicated to technical and engineering analysis, with a goal of establishing a 43-101 compliant mineral resource by early 2011.

Drilling:

Up to 10,000 metres drilling is planned at Lac Cinquante, starting with one on-site rig in early April 2010. Drilling will target historic resource dimensions and the known mineralized envelope using information from historic core on-site and results from Kivalliq's highly successful 2009 drill campaign. Exploration drilling will focus on demonstrating the expansion potential at Lac Cinquante where mineralisation is open along strike and to depth. In addition, drilling will test high-priority targets along the 9 km long Lac Cinquante geophysical trend.

Property-wide Exploration:

The Company plans to continue an aggressive program of surface exploration on the remainder of the 225,000 acre Angilak property, which has over 150 known uranium occurrences, representing several different model types. This summer program will consist of prospecting, sampling and drill target identification.

Technical Work and Baseline Studies:

To aid in the planning of the project's future exploration and development, the Company is undertaking a series of technical and baseline studies. Preliminary metallurgical work is underway and environmental baseline studies will begin this year. JDS Energy and Mining has also been engaged to perform a conceptual economic and access study for the project. Resource modeling will commence in Q4 2010.

Disclosure of a technical nature contained in this release has been reviewed and approved by Jeff Ward, P.Geo (Vice President Exploration of Kivalliq) and who is a Qualified Person for the purposes of National Instrument 43-101.

Acceleration of Warrants:

Kivalliq also announced that pursuant to the terms of the warrants (the "Warrants") issued as part of Kivalliq's private placement offerings ("Private Placements"), which closed on May 26, 2009, Kivalliq has elected to exercise its right (the "Acceleration Right") to reduce the period within which the Warrants may be exercised. The Company will provide written notice of the acceleration to each of the Warrantholders.

The Acceleration Right was triggered when the weighted average trading price of Kivalliq's common shares on the TSX Venture Exchange ("Exchange") was at a price equal to, or greater than, $0.40 CDN, being $0.10 CDN above the current exercise price of the Warrants, for a period of 10 consecutive trading days, commencing February 22, 2010 through to Mar 5, 2009. On March 5, 2010 the closing price of the common shares on the Exchange was $0.425 CDN.

Warrantholders will be entitled to exercise the Warrants for a period of 30 days commencing March 9th, 2010 and ending April 7th, 2010. All Warrants not exercised on or before 12:00 p.m. (Pacific time) on April 7th, 2010 will expire and be void and of no further force and effect.

Proceeds from the exercise of warrants will be applied towards Kivalliq's 2010 exploration program.

Published 09/02/2010

Kivalliq Energy Corporation is a uranium exploration and development company, and the first company in Canada to sign a comprehensive agreement with the Inuit of Nunavut to explore for uranium on Inuit Owned Lands in Nunavut.

This landmark partnership with the Inuit gives Kivalliq a unique opportunity to explore and develop the Lac Cinquante Deposit, northern Canada's highest grade uranium deposit. Reported to contain 20.4 million pounds of uranium oxide with grades in excess of 1% U3O8 (not National Instrument 43-101 compliant)**, the historic Lac Cinquante uranium deposit and over 160 other uranium occurrences on the property comprise Kivalliq's core asset, the 270,000 acre Angilak Project.

Find out more about:

Kivalliq Energy »

Search for more News


Nuclear Power (Energy Sources)

Nuclear Power is not the Answer












Advertising || About Us || Contact Us || Search || Legal || Tell a Friend
© Copyright 2010 - All rights reserved